| Sr. No. | Project Name | Scope | Role | Client |
|---|---|---|---|---|
| 1 | 20MW Power Plant – Layyah Sugar Mills | Secondary system design Interface engineering. Testing & Commissioning of 132kv Outdoor switchyard. Protection & Control system. | Engineering & Testing Service provider | Thal Industries Corporation Ltd. Lahore |
| 2 | 220/132 KV AIS Substation at Mansehra | Secondary system design & interface engineering . Testing & Commissioning of 220kv & 132kv Outdoor switchyard, Protection , Control DFR & SCADA System | TC Subcontractor | NETRACON Technology Pvt Ltd |
| 3 | Thar Block-II TEL 335 MW Coal Power Plant | Protection System Configuration, Testing & Commissioning of Unit 3 | TC Subcontractor | SIEMENS Power Automation Ltd., China |
| 4 | Design, Supply, Replacement of existing CRP’s for 132kv Underground Double Circuit between 132kv Sunny View, Qartaba & McLeod Road Grid stations/ LESCO Project ( Lot I & III) | Design, Supply , Installation & Testing of Protection & Control system associated with Double circuit 132kv UGC feeders between , Sunny View, Qartaba & McLeod Road Grids in Lahore City area | ETC Subcontractor | Associated Commercial Agencies ( Pvt.) Ltd |
| 5 | 120MW Co-Generation Power Plant Fatima Energy Pvt Ltd (FEL) at Sanawan; Distt MUZAFARGARH | Configuration & testing of Restricted Earth Fault Protection | Contractor | Fatima Energy Pvt Ltd |
| 6 | 220kv Grid Station NTDC NOWSHERA | Testing and commissioning of 220kv & 132kv switchyard & allied auxiliaries | Wiring, testing & Comm Subcontractor | PEL Pvt Ltd |
| 7 | Rehabilitation of 50kW Solar+ Wind Hybrid Power plant | Repair , testing and rehabilitation | Contractor | Quaid-e-Azam Solar Power (Pvt.) Ltd., Lahore. |
| 8 | 32MW Power Plant - Shahtaj Sugar Mills | Secondary system design Interface engineering. Testing & Commissioning of 32 MW Co-Gen Plant, 132kv Outdoor switchyard. Protection & Control system | Engineering & Testing Service provider | Shataj Sugar Mills- Mandi Bahauddin |